Standing Seam Metal Roofing
The system that comes through a named storm best, and the one insurers are happiest to see.
- From
- $1,150 / square
- Life
- 40–50 years
- Wind
- 160–180 mph assemblies
- On site
- 4–7 days

There are two things sold as metal roofing and they are not the same product. Exposed-fastener panels are screwed through the face into the deck, and every one of those screws has a rubber washer that hardens and shrinks in this climate — you are looking at re-screwing the roof within a decade. Standing seam uses concealed clips: the panel is held at the seam and is free to expand and contract, and there is no gasket anywhere in the water path.
Within a few miles of the Gulf we specify aluminium rather than galvanised steel. Steel with a good coating is fine inland, but salt finds a coating edge eventually and once it starts at a cut end it does not stop. Aluminium simply has no rust to give, and on Fort Myers Beach, Sanibel or the McGregor corridor that difference is the whole decision.
We roll-form panels to length on site, which means no end laps on a typical run — and an end lap is the only place a standing seam roof is likely to leak. It also means the truck has to get to the property, which is worth checking before you fall in love with the idea on a tight lot.
What is in the price
Concealed clip system
No exposed fasteners in the water path, and panels free to move with temperature.
Aluminium within the salt zone
Specified as standard near the water. Steel only where distance from the Gulf genuinely justifies it.
Panels formed on site
Roll-formed to full length so a typical slope has no end laps at all.
High-temperature underlayment
Metal gets hot. Standard peel-and-stick will bleed asphalt under a metal panel; this does not.
Full trim package
Ridge, hip, valley, rake, eave and every penetration flashed in matching material.
Florida Product Approval supplied
The approval number for the exact panel, clip spacing and deck attachment goes on the permit and to you.
How it runs
- 1
Survey, including access
We check the roof and the driveway — the roll former has to reach the property for on-site panels.
- 2
Panel, gauge and colour
Profile, seam height, gauge and finish chosen against your exposure. Samples left on site.
- 3
Permit with approvals
Filed with the assembly's product approval and clip spacing for your design pressure.
- 4
Dry-in, form, install
Deck re-nailed and dried in first, then panels formed and set, then trim and flashing.
Questions on this one
Is a metal roof loud in rain?
Not over a solid deck with underlayment and an insulated attic beneath it. The noise people remember is corrugated metal over open purlins on a barn. On a house it is quieter than most people expect and quieter than tile in hail.
Will it dent?
A heavy branch or a dropped tool will mark a panel, and heavier gauge resists it better. It is the honest trade-off against shingle: metal survives wind far better and cosmetic damage is a panel replacement rather than a patch.
Does metal lower my insurance?
Frequently, though it varies by carrier. What moves the premium is what goes on the wind mitigation form — roof covering type and its approval, deck attachment, roof-to-wall connection and secondary water barrier. A properly documented metal roof scores well on several of those at once.
Free inspection
Get it looked at.
Report the same day.
We go on the roof and into the attic, photograph everything, and email you the report — whether or not you ever hire us. No deposit, no doorstep pressure.

Office
Storm line · 24/7
Yard
5641 Division Dr
Fort Myers, FL 33905
Hours
Mon–Fri · 7:00am – 6:00pm
Saturday · 8:00am – 1:00pm
Storm line · 24/7 in season